Turn-key Project

Early stage:
understand local policies and regulations, project content, requirements and budget, overall design, schedule and preparation work

Early stage:

understand local policies and regulations, project content, requirements and budget, overall design, schedule and preparation work

Mid-term:

Civil engineering and preparation, production, quality control, testing, installation,

commissioning, training and acceptance of whole project facilities.

Later period: after-sales service and maintenance of equipment operation

Content

1. Main equipment:

Receiving, storage and metering of raw materials:

1). Powder: According to the actual needs of the project, design the volume and quantityof the silo. Determine the location of the storage area.

Conveying: use pneumatic conveying system, negative pressure feeding, pipeline chain machine, bucket elevator or screw.

2). Liquid: According to the actual needs of the project, design the volume and quantity of storage tanks, and determine the location and structure of the tank area.

Delivery: Choose liquid intelligent dosing pump, negative pressure feeding.

3). Additives: In view of the characteristics of "more varieties and less dosage", the storageconditions and locations of the nearby production equipment are designed.

Delivery: choose pipeline or manual.

Main body of production equipment:

1). Process design. Product production zone.

2). Production, installation, commissioning, training, and acceptance of fully automatic complete sets of equipment.

The palletizing turnover storage and delivery of finished products:

1). Automatic labeling, unpacking, sealing, coding, strapping, wrapping

2). Robot packing and palletizing

3). AGV robot inbound and outbound transportation

4). Shelves, (explosion-proof) stackers

Control center: automatic monitoring of production process, digital display screen, IOT module

2. Laboratory and R&D room: A full set of instruments and tools and supporting furniture facilities.

3. Auxiliary facilities: Transformers, power distribution rooms, chillers, compressors, maintenance rooms, lighting, fire protection, WiFi, pipeline layout, oil pollution, sewage treatment plants, etc.

4. Administrative office area and exhibition hall.